When active leaks threatened the valve chamber of this hydropower plant, the EURAS® team responded with high-pressure injection of Gel Type B—sealing the structure in just 48 hours.
Elektroprivreda Srbije (EPS)
PAP Lisina – HE Vrla, Serbia
Persistent water leaks in the penstock galleries of this hydroelectric plant were compromising operations and structural safety. Traditional methods failed — until EURAS® Gel Type B was applied.
2015
ELEM – Elektrani na Severna Makedonija
HEC Sveta Petka, FYR Macedonia
A leaking expansion joint (S2–S3) in one of Serbia’s most critical hydroelectric plants was sealed without shutting down operations using EURAS® Gel Type B.
2015
HE Djerdap, Srbija
Serbia