ČHE Avče is Slovenia’s first pumped-storage power plant, a strategic facility providing grid balancing and peak electricity production. Over time, persistent water ingress developed at critical interfaces between the surge chamber and the connecting tunnels, as well as around construction joints.
Key challenges included:
Traditional approaches such as cement-based grouting were ineffective in achieving lasting watertightness, and the client required a flexible, adaptive sealing system compatible with dynamic water loads.
After technical evaluation, EURAS® Gel Type B was selected to solve the issue due to:
The EURAS team executed a targeted intervention that included:
Despite the complexity, the work was conducted without interrupting plant readiness.
The ČHE Avče project demonstrates the value of EURAS® Gel Type B in complex hydropower infrastructure where:
EURAS delivered a proven method to protect this strategic asset for years to come.